OUR SERVICES
Modular construction doesn’t have to be overwhelming. At UrbanBloc, we make the design, permitting, and construction processes easy. Our team brings a versatile set of skills and experience to the table, giving our clients peace of mind that we’re with you every step of the way.
Most of our projects are California-based, though we can work with you to explore projects based in other regions. For California projects, we secure a building permit through the State of California's Commercial Modular program. Once we have a state permit in hand we build our containers in our factory and arrange to have them shipped to the site where a local builder will place and install the containers.
Our design process is fast and efficient, often taking just a matter of weeks to secure a permit. For food units, we work with the local health department to secure health department approvals. Once our containers reach the site, installation by a general contractor is straightforward.
The total time from start to finish varies by the project but is typically in the range of 4 - 6 months from the beginning of the design phase through installation.
Here are some of the specific services we provide for each stage of the design-build process:
PRECONSTRUCTION CONSULTING
Project Feasibility Studies — project ideation and feasibility based on client goals and objectives; options for site activation, revenue generation or meeting other strategic goals.
Site Evaluation — review of potential site attributes and shortcomings, identification of site requirements to support container infrastructure, brainstorming ideas, and overcoming barriers.
Estimating — rough pricing out for early-stage budgeting purposes.
Conceptual Drawings — high-level sketches to support planning and enable marketing of the site for strategic or leasing purposes.
DESIGN SERVICES
Conceptual Design — rough container layouts to align with your goals, provide optimal site circulation, support anticipated workflows, and embody your branding.
Design Development and Permit Documentation — architectural design, mechanical/electrical/plumbing layouts, and structural engineering including Title 24 (energy efficiency and environmental quality) calculations.
PERMITTING
State Permit Approval — submitting drawings to the state for state permit.
Health Department Review and Approval — submitting and facilitating drawings for Environmental Health Plan check and approval.
MANUFACTURING
Construction — full construction of your project in our factory.
Inspections — scheduling and securing state inspections.
Delivery — ensuring a smooth delivery to the site and coordinate with the general contractor for installation of the finished project on site.